Skip to content

C2C - Specification

Specification

Independent specifications can be produced to a project benchmark level to be issued with tender documentation. This includes the requirements for thermal bridging details to ensure a more accurate tender process.

Specialist specification preparation eliminates the generic tender information, which can be sometimes detrimental to a scheme which has a desired performance criteria.